When should you cut concrete after pouring?

For most concrete work, cutting should take place within the first 6 to 18 hours and never beyond 24 hours. Smaller early-entry saws are available, which may allow cutting to begin within a few hours after placement.
Takedown request   |   View complete answer on cobraconcrete.com


Can you cut concrete after its cured?

After the concrete is poured, you can start cutting your concrete slabs within six to eighteen hours. During particularly hot weather, you can even begin as early as four hours after the concrete is poured.
Takedown request   |   View complete answer on diamondcutconcrete.com.au


When should concrete be saw cut?

Timing is very important. Joints should be sawed as soon as the concrete will withstand the energy of sawing without raveling or dislodging aggregate particles. For most concrete mixtures, this means sawing should be completed within the first six to 18 hours and never delayed more than 24 hours.
Takedown request   |   View complete answer on cement.org


Do I need to cut my concrete slab?

Saw cuts are a used to create control joints in concrete, which help control where cracking occurs due to shrinkage. The cuts should be made at a predetermined spacing and only after the concrete has obtained sufficient strength but before internal cracking begins. Therefore, the timing of saw cuts is critical.
Takedown request   |   View complete answer on thespruce.com


Why do they cut lines in concrete?

These lines are called contraction lines and this is going to help in relieving the stress that is going to cause the cracks that are going to be present in the concrete. You may notice these are going to vary in depth, but the concrete line depth is fairly universal in how deep they are going to be cut.
Takedown request   |   View complete answer on megasaw.com.au


When To Start Finishing Concrete After The Pour



How many times do you float concrete?

Push the bull float in one direction only across the concrete, keeping its front edge slightly above the surface by raising or lowering the handle. Two or three times is enough. Don't overwork the concrete or you'll weaken it by drawing too much sand and cement to the surface.
Takedown request   |   View complete answer on wonkeedonkeetools.co.uk


How do I keep my concrete slab from cracking?

If you're having new concrete poured consider the following ways to prevent cracking:
  1. Start with a sound subgrade. Make sure the subgrade is compacted. ...
  2. Modify the concrete mix. Use a low water-to-cement ratio. ...
  3. Install joints. Be active in deciding where control joints will be placed. ...
  4. Properly cure the concrete.
Takedown request   |   View complete answer on concretenetwork.com


How big can a concrete slab be without expansion joints?

Rule #1 – Keep joints as square as possible. Rule #2 – In order to prevent intermediate cracking, space joints (in feet) no more than 2 – 3 times the slab thickness (in inches).
Takedown request   |   View complete answer on carrollsbuildingmaterials.com


Does rebar prevent cracking concrete?

Steel reinforcing bars and welded wire reinforcement will not prevent cracking. Reinforcement is basically dormant until the concrete cracks. After cracking, it becomes active and controls crack widths by restricting crack growth.
Takedown request   |   View complete answer on forconstructionpros.com


Do you push or pull a concrete saw?

Always let the saw do the work; simply guide its direction, but don't push it down into the concrete. You only need a quarter-inch cut at this point, but if the saw bites in a bit deeper, that's fine too. This first guided cut will ensure you keep your cuts straight during the rest of the project.
Takedown request   |   View complete answer on bobvila.com


How far apart should concrete cuts be?

Cuts should be approx. 2-3 times the thickness of your slab in feet. For example, a 6” slab would have cuts 12' – 18' apart. This is strictly a guideline to work from.
Takedown request   |   View complete answer on blog.bartellglobal.com


Do you need expansion joints in concrete?

Concrete expansion joints are particularly important where there have been consecutive concrete pours and are also useful when laying concrete within an area bordered by walls or buildings or if objects such as manhole covers need to be incorporated.
Takedown request   |   View complete answer on hanson.co.uk


What happens if you cut concrete after 24 hours?

Cutting freshly poured concrete too late can lead to unwanted cracks in the concrete, rendering the joints ineffective. Too early and the concrete will not have cured enough to support the saw and operator.
Takedown request   |   View complete answer on cobraconcrete.com


How long does it take a concrete slab to cure?

Concrete typically takes 24 to 48 hours to dry enough for you to walk or drive on it. However, concrete drying is a continuous and fluid event, and usually reaches its full effective strength after about 28 days. Here are some of the basic facts regarding the question of concrete drying time.
Takedown request   |   View complete answer on dcpu1.com


How long should concrete cure before putting weight on it?

Although concrete will harden soon after pouring, it's still susceptible to damage from weight during the first four weeks. Wait at least 24 hours before allowing foot traffic, including pets, on a newly poured sidewalk or slab, and don't drive a vehicle on a new driveway for at least 10 days.
Takedown request   |   View complete answer on bobvila.com


What happens if you don't put expansion joints in concrete?

Concrete expansion joints give the slabs just enough room to move which helps prevent cracks & buckling. Without these joints, even a little movement creates pressure and stress on the concrete. Eventually weak spots can crack or buckle.
Takedown request   |   View complete answer on gambrick.com


How thick should a concrete slab be?

Standard concrete floor slab thickness in residential construction is 4 inches. Five to six inches is recommended if the concrete will receive occasional heavy loads, such as motor homes or garbage trucks. To prepare the base, cut the ground level to the proper depth to allow for the slab thickness.
Takedown request   |   View complete answer on concreteconstruction.net


How do you cut concrete slab?

Use a standard circular saw, equipped with a corundum or diamond blade, for small tasks. For slabs, it's best to cut through the top inch, then use a sledgehammer to break off the rest. The jagged edge left below the cutting line provides a good rough edge for the new concrete to bond to.
Takedown request   |   View complete answer on familyhandyman.com


Are hairline cracks in new concrete normal?

Yes, in about a month, hairline cracks should subside. While shrinkage cracks can show up on the surface within hours of having concrete poured, it takes a full monthfor new concrete to fully settle. Don't be surprised if cracks that seemed visible at first are nearly impossible to see after a month of settling.
Takedown request   |   View complete answer on angi.com


Does watering concrete stop cracking?

One of the most common mistakes DIYers new to concrete make is to add too much water to the dry concrete mix for easier mixing, which leads to weak concrete and a high risk of cracking. Even just one additional quart of water can reduce concrete's strength by up to 40 percent!
Takedown request   |   View complete answer on bobvila.com


Should you fix hairline cracks in concrete?

A well-made concrete structure should not develop structural cracks quickly. Nevertheless, hairline cracks can be expected. Don't stress; these cracks are not a sign of bad quality and can be fixed without much effort.
Takedown request   |   View complete answer on bigdreadymix.com


Can you leave concrete forms on too long?

In short, there is no such thing as leaving concrete forms on for too long, as they will simply continue the curing process as the forms remain in place. However, there is no real need to leave forms on for longer than necessary.
Takedown request   |   View complete answer on homeimprovementscout.com


How long do you wait to trowel concrete?

Allow all of the water to disappear before you do anything else. This can take 20 minutes or 4 hours depending on the temperature, humidity and how hard the wind is blowing. After the bleed water is all gone you can get out your steel finishing trowel and put on the final touches.
Takedown request   |   View complete answer on instructables.com


Why do brooms finish concrete?

Sometimes called brushed concrete, a broom is used to create a slip-resistant texture on the surface of the concrete. Concrete finishers have been broom finishing for about as long as there has been concrete. Broom finished thin overlays add skid resistance and upgrade a deteriorating concrete surface.
Takedown request   |   View complete answer on concretenetwork.com
Previous question
Is burping rude in Japan?