What should you drywall first?

Hanging Drywall From the Top Down
Hang drywall on the ceiling first, then the walls. Check the ceiling for bowed joists using a 4-ft. level. Irregularities less than 1/8 in.
Takedown request   |   View complete answer on popularmechanics.com


What order do you put drywall?

Install the top row of panels first, pushing each panel up as tight as it will go against the ceiling drywall. Lifting and holding the panels takes at least two workers. The lower horizontal row of panels is the last to install. Push it up tightly against the top row.
Takedown request   |   View complete answer on homeguides.sfgate.com


In what order should drywall be fastened to a wall?

After covering the ceiling with drywall, you will attach the top sheets of drywall to the wall. When installing drywall that is horizontally-oriented, start with the top and work your way down. The idea is to make your cut side facing the floor, where it will be later covered up with baseboards.
Takedown request   |   View complete answer on thespruce.com


Where do I start with drywall?

Hang Drywall
  • Starting with the top row, apply adhesive to the studs. ...
  • Holding the first sheet horizontally across the ceiling and close to the corner, align both vertical sides with studs. ...
  • Measure the remaining space, adding 1/4 inch for easier installation. ...
  • Tack the second piece into place with ring drywall nails.
Takedown request   |   View complete answer on lowes.com


Should drywall touch the floor?

Drywall should NOT touch the floor. Allow for floor and wall expansion without cracking the drywall by keeping a 1/2-inch (1.27-cm) space between them. This space also aids in preventing moisture from seeping if the floor floods.
Takedown request   |   View complete answer on homeefficiencyguide.com


Drywall Basics | Drywall Installation Guide Part 1



What order do you tape drywall seams?

The order of taping is the same: Do screw indentations and beveled joints first, inside and outside corners next, and butt joints last.
Takedown request   |   View complete answer on bobvila.com


Why do you hang drywall on the ceiling before the walls?

Increased Ceiling Support

The primary reason that you want to start with the ceiling pieces first in installing drywall is for additional support. When you attach the ceiling sheets first, you can reinforce them with the wall pieces which will serve as a source of stability.
Takedown request   |   View complete answer on interiorsplace.com


How far should drywall be off the ceiling?

In fact, when you're hanging the ceiling, keep in mind that 1/2 in. along the perimeter will be covered by drywall on the walls. And the same is true of inside wall corners. So you can safely cut these pieces 1/4 in.
Takedown request   |   View complete answer on familyhandyman.com


Should drywall be hung horizontally or vertically?

Final Thoughts. In short, drywall should be hung horizontally on residential buildings and vertically on commercial buildings. In the case of either, support beams should always run perpendicular to the wall studs at a distance of 24 inches (61 cm) apart.
Takedown request   |   View complete answer on homeefficiencyguide.com


How far should drywall screws go into studs?

Primarily, studs support walls and run between the floor and ceiling. They are sometimes visible or hidden behind drywall. What is this? The ideal depth a screw should go into a stud is 3/4 of the length of the screw's bottom part.
Takedown request   |   View complete answer on homedecorbliss.com


Do you sand in between coats of drywall mud?

After the first coat has dried completely, you will need to sand and apply two more coats to the fasteners, sanding between each coat. Keep your knife clean by drawing it over the edge of the mudpan or hawk.
Takedown request   |   View complete answer on certainteed.com


Should drywall be staggered?

Drywall butt joints should always be staggered. This makes it easier for taping and finishing and increases the overall strength of the entire wall.
Takedown request   |   View complete answer on drywall101.com


What goes on top drywall?

Compound. Compound, also called spackle or mud, is an important item that goes on top of drywall. After hanging and screwing drywall to wall studs, you must apply the compound to the drywall board seams using a 4-inch-wide knife.
Takedown request   |   View complete answer on hunker.com


Should drywall end on stud?

Drywall Is Not on a Stud

All edges of all sheets of drywall must land on a solid surface such as a stud. A hanging drywall edge may work in the short-term, but in the long-term it can result in cracks and other serious wall issues. Sometimes, the drywall does not horizontally reach a stud.
Takedown request   |   View complete answer on thespruce.com


Why do you hang drywall sideways?

Horizontal hanging reduces the lineal footage of seams by about 25%. Keeping the footage of seams to a minimum will result in less taping and a better looking finished job. Hanging horizontally also allows the drywall to flow over the framing so that bowed studs create less of a problem.
Takedown request   |   View complete answer on probuilder.com


Do you stagger drywall seams on ceiling?

It's not necessary to stagger seams on ceiling drywall. However, because these joints are relatively difficult to finish – and tend to be noticeable in the finished product – it's a good idea to stagger the drywall panels to make the joints less visible.
Takedown request   |   View complete answer on homeguides.sfgate.com


Do you tape or mud first?

Paper tape you apply mud first then bed the paper tape with mud still wet. Scrape the paper tape with a taping knife to bed the tape. A thin layer of mud will cover the tape in the process. Apply a wider layer of mud over top and smooth it out and feather the edges.
Takedown request   |   View complete answer on diy.stackexchange.com


Should drywall tape overlap at corners?

DON'T overlap drywall tape.

Its flexible blade will distribute mud uniformly over the joints.
Takedown request   |   View complete answer on bobvila.com


Do you overlap drywall tape in corners?

It's still possible to create a wavy corner if you push too hard, so apply light, even pressure as you smooth the joint compound. The strips reduce ripples and bubbles too, so there's no need to wet the tape. Don't overlap the tape where inside corners meet the ceiling.
Takedown request   |   View complete answer on familyhandyman.com


Should you glue and screw drywall?

A best practice is to nail or screw the edges of the board, but only use screws in the field. Using adhesive for drywall reduces the need for screws in the field or middle of the board but some are still needed.
Takedown request   |   View complete answer on loctiteproducts.com


How many screws go into a 4x8 sheet of drywall?

The short answer: 28 screws are needed for attaching a 4-by-8 sheet of drywall. If it's 4-by-12, it'll take about 36 screws. When screwing drywall sheets (4-by-8) to the studs vertically, use four screws, and start at the top. Give each of the screws about 16 inches apart from one another.
Takedown request   |   View complete answer on h2ouse.org


Should I use #6 or #8 drywall screws?

In most cases, you will be using either #6 or #8 drywall screws. Keep in mind that as gauge numbers increase, the screw becomes larger in diameter. So, a #6 drywall screw would be thinner than a #8 drywall screw. While this may seem evident, many materials related to home construction work in the opposite direction.
Takedown request   |   View complete answer on thespruce.com