What does Event Code 3000 mean?

3000 ORDER ACCEPTED BY PRODUCTION CONTROL. 3100 ORDER AVAILABLE TO SEQUENCE. 3300 ORDER SELECTED, SCHEDULED FOR PRODUCITON. 3400 ORDER BROADCAST FOR PRODUCTION (LOADED ON ASSEMBLY PLANT COMPUTERS)
Takedown request   |   View complete answer on gmauthority.com


What does 3000 status mean on Corvette order?

3000 – Accepted by Production Control: Your Corvette order has now been accepted for production. No more changes can be made to your order.
Takedown request   |   View complete answer on vanbortelcorvettes.net


What does preliminary order accepted mean?

07/02/2021 received code 1100. Description 1100 – Preliminary Order Accepted. This status means that your order has been entered into the system and your dealer is waiting for allocation to match up with your place in line so that it can be submitted to GM.
Takedown request   |   View complete answer on gmauthority.com


What is GM event code 2000?

2000, Order accepted by GM (This means the order has been submitted and accepted by production. You are now on your way.)
Takedown request   |   View complete answer on cadillacvnet.com


What does intermediate delivery mean?

Ok let me put this our here 4300 intermediate delivery code is normally used for shipping to an off site location for something like a sprayed in bedliner or a small hold on an out of stock item it can bounce between 4200 and 4300. the code for left the factory shipped is 4800 rail ramp unload. (
Takedown request   |   View complete answer on gminsidenews.com


My 2020 Corvette C8 Order Update! Understanding Status Codes



What is GM event code 4300 Intermediate delivery?

4300 INTERMEDIATE DELIVERY. 4800 RAIL RAMP UNLOAD; VEHICLE AT RAIL ROAD DESTINATION AWAITING TRUCK TRANSPORT TO DEALER.
Takedown request   |   View complete answer on gmauthority.com


Can I track my new GMC truck being built?

Due to logistical reasons, GM Authority no longer provides GMC order tracking. If you are interested in tracking your vehicle, please visit GMC.com and initiate a live chat session. There, you will be able to provide the representative with your vehicle order number, which is provided to you by your dealer.
Takedown request   |   View complete answer on gmauthority.com


How long does it take for 3400 to deliver?

I would say on the day your car goes to 3400, your car is built in around 4-5 days and if you live in a place that gets alot of corvettes, your car should be delivered in another 4-5 days. My C8 was built on July 7th (2021) and delivered to the dealer on July 12th.
Takedown request   |   View complete answer on corvetteforum.com


What does it mean when a car is bayed?

It seems to mean the car has been bayed, set apart from the other cars, in anticipation of being loaded on a transport. My car was bayed for several days, today it received a destination.
Takedown request   |   View complete answer on midenginecorvetteforum.com


How long does it take for a car to be delivered to the dealership 2021?

The distribution company will transport your car from the docks to the dealership. Once you've reached this stage, the dealer should be able to give you a firm delivery date; however, the time frame from completed pre-delivery inspection paperwork to actual delivery can vary from three days up to two weeks.
Takedown request   |   View complete answer on jjmotors.co.uk


How long does it take to order a new Chevy truck?

Well, GM order to delivery time can vary. But since you are custom ordering your new Chevrolet vehicle, you might have to wait approximately six to eight weeks, for some, that may be a longer time than they are willing to wait, but keep in mind that you are building your dream car, and that does take time.
Takedown request   |   View complete answer on denooyer.com


How long is the wait for a new Chevy truck?

Typically, GM wants six to eight weeks to process the order, schedule the build, then transport it to your local dealership. Wait periods could take up to three months or a bit more, but not usually. If leasing suits you better, GM has special leasing packages for the Silverado this month (March 2022).
Takedown request   |   View complete answer on motorbiscuit.com


How long does it take to build a 2021 Corvette?

It will take around 60 working days, or two working months, to build 11,000 units, if we optimistically assume that there will be no further shutdowns or production interruptions.
Takedown request   |   View complete answer on gmauthority.com


What is the wait time for a Corvette?

Average wait is about 10-12 months.
Takedown request   |   View complete answer on corvetteforum.com


How long does a Corvette take to deliver?

Once your order is placed, the expected build and delivery time is 6 to 8 weeks.
Takedown request   |   View complete answer on chevycorvette.com


What does bayed date mean?

The Bayed Date is date it was parked in it's current location.
Takedown request   |   View complete answer on camaro6.com


What does 4B00 mean?

4B00, often wrongly referred to as 4800, means that the car has completed assembly (and any QC checks) and awaiting transportation in the huge lot outside the assembly plant. Time in 4B00 has a lot to do with transportation logistics.
Takedown request   |   View complete answer on midenginecorvetteforum.com


Can I use myGMC app without OnStar?

The app offers very basic information and services if you let your OnStar account run out. You'll still have digital access to your owner's manual, you'll be able to schedule service with Husker GMC's service department, and you can call for roadside assistance if you find yourself stranded.
Takedown request   |   View complete answer on huskergmc.com


How can I track my GM order?

New Vehicle Order Tracking
  1. Main:855-973-8042.
  2. Sales:855-973-8042.
Takedown request   |   View complete answer on gychevy.com


What does GM 3400 status mean?

Status code 3400 means that GM has sequenced the car in the production plan, and that your order now definitely has a TPW (see below for much more about TPWs).
Takedown request   |   View complete answer on gminsidenews.com


What is GM event code 4D00?

Its showing the dreaded 4D00 Mp unit which means its built but waiting for chips.
Takedown request   |   View complete answer on gminsidenews.com


Are 2022 Corvettes being built now?

Chevrolet to Extend 2022 Corvette Model Year Production for an Extra Week. Chevrolet just made some 900 or so Corvette owners very happy and most probably don't even know it! A near-perfect week of Corvette production at the Corvette Assembly Plant would see the completion of about 184 cars per day or 920 for the week.
Takedown request   |   View complete answer on corvetteblogger.com


Why are Chevy trucks delayed?

In a rather surprising move, Chevy Silverado, GMC Sierra delays are coming due to a production halt in April for a few weeks at General Motors' Fort Wayne Assembly plant. The news first reported by CNBC.com on Friday, March 25, 2022, states the plants production halt is due to the ongoing semiconductor chip shortage.
Takedown request   |   View complete answer on pickuptrucktalk.com