You do need gravel under a concrete slab, footing, or patio. Gravel provides a solid foundation for your concrete as it can be compacted. It also improves drainage, preventing water from pooling beneath the concrete.
Takedown request   |   View complete answer on plasticinehouse.com


What happens if you don't put gravel under concrete?

Because concrete is a very porous material, it will absorb any moisture that it contacts. This can cause pooling. Without crushed stone, pooling water will settle under it and erode your slab. Adding a layer of crushed stone will add proper drainage, as well as create a barrier between your slab and the ground.
Takedown request   |   View complete answer on irwinstone.com


What kind of gravel do you put under concrete?

The base in concrete construction is usually a form of crushed stone. Most concrete contractors want a mix of coarse and fine aggregate to create a compactable base that is going to be safe for settlement and drainage.
Takedown request   |   View complete answer on tristar-concrete.com


Does concrete need a gravel base?

Whether you pour concrete for a walkway or patio, a strong gravel base is required to prevent the concrete from cracking and shifting. Gravel is especially important in clay soil because it doesn't drain well, which results in water pooling under the concrete slab and slowly eroding the soil as it finally drains.
Takedown request   |   View complete answer on homeguides.sfgate.com


Is gravel or sand better under concrete?

As a general rule, stay away from using sand as a subbase. You're better off using gravel; your concrete will last longer and have less of a chance of cracking over time.
Takedown request   |   View complete answer on angi.com


Do I need gravel under concrete slab?



Can you lay concrete over gravel?

Cement mix might work in some cases over an existing gravel driveway. Laying a concrete driveway over an existing gravel one is possible, but it is not generally recommended. The kind of gravel that is intended to go under cement is typically a smaller grade than what is used for gravel driveways.
Takedown request   |   View complete answer on hunker.com


Can I pour concrete directly on dirt?

Long story short, yes you can pour concrete over dirt.
Takedown request   |   View complete answer on razorbackconcrete.com


How much gravel do I need under concrete?

Determine the depth of the excavation. Let's say it's d = 2 yd . Multiply the area and depth of the excavation to obtain its volume in cubic yards: 18 * 2 = 36 yd³ . The volume of gravel required is equal to the volume of excavation.
Takedown request   |   View complete answer on omnicalculator.com


What is the best base under concrete?

What is the Best Base for a Concrete Slab? Most people build a driveway or a patio so in that case, a good choice would be a mix of coarse and fine aggregate which will create a compactable base. Overall, a mix of crushed stone and stone dust is the best base material for any concrete flatwork.
Takedown request   |   View complete answer on specifier.com.au


How deep should footings be?

Depth of Footings

Footings should extend to a minimum depth of 12 inches below previously undisturbed soil. Footings also must extend at least 12 inches below the frost line (the depth to which the ground freezes in winter) or must be frost-protected.
Takedown request   |   View complete answer on thespruce.com


How do you prepare subgrade for concrete?

Before you start any concrete project, you need to be sure you have a clear area. Make sure you know the depth of your concrete project, and then remove soil, organic materials, rocks or other items in the area. Be sure to remove enough so that the final area of your concrete will sit slightly above ground.
Takedown request   |   View complete answer on ozinga.com


What size gravel is used in concrete?

Coarse aggregates are any particles greater than 0.19 inch, but generally range between 3/8 and 1.5 inches in diameter. Gravels constitute the majority of coarse aggregate used in concrete with crushed stone making up most of the remainder.
Takedown request   |   View complete answer on cement.org


How long do footers need to cure?

Allow the concrete to cure for one day before constructing your deck or placing heavy weight on the footing (if standard concrete mix was used, wait about 3 days to begin construction).
Takedown request   |   View complete answer on quikrete.com


Is 3 inches of concrete enough?

A concrete patio slab should be at least 4 inches thick and have a compressive strength of 3,000 PSI. You're free to make it thicker or stronger, but unless specifically required for your patio build, it's likely overkill to surpass 4 inches in thickness.
Takedown request   |   View complete answer on plasticinehouse.com


How much sand and gravel do I need for a yard of concrete?

An average 1:2:3 mix contains one part cement, two parts sand and three parts gravel. To make 1 cubic yard of concrete, you'd need seven 94-pound bags of cement, about 1/2 cubic yard of sand and just over 3/4 cubic yard of gravel.
Takedown request   |   View complete answer on popularmechanics.com


Can you pour concrete over rocks?

Big rocks are not a problem as long as there is uniform concrete coverage and adequate rebar for temperature fluctuations. If the big rocks protrude up above grade and if you have a few in a row, it will weaken the slab. We like things uniform, including the grade, thickness of the concrete, etc.
Takedown request   |   View complete answer on diy.stackexchange.com


Do you need hardcore for concrete base?

You can't lay a concrete base directly onto soft ground, so a hardcore sub-base is essential.
Takedown request   |   View complete answer on hss.com


What is the purpose of gravel under concrete?

Gravel provides a solid foundation for your concrete as it can be compacted. It also improves drainage, preventing water from pooling beneath the concrete.
Takedown request   |   View complete answer on plasticinehouse.com


How deep should you lay gravel?

Mulch and gravel under 1-1/2” in size will need to be 2-1/2” deep. Gravel 1-1/2” to 2” will need to be 3” deep, and 2” to 4” gravel needs to be 4” deep. This is to provide complete coverage and so you cannot see the landscape fabric (weed-mat) through the gaps in the gravel.
Takedown request   |   View complete answer on stoneplus.com


What area will 1 ton of gravel cover?

A ton of gravel will cover approximately 100 square feet, 2 inches deep.
Takedown request   |   View complete answer on naturesearthproducts.com


Do I need to compact soil before pouring concrete?

The soil you build your concrete pad on needs to be compact and well-drained to ensure the best concrete slab results. Concrete is a porous material so drainage can't be an issue. Otherwise, water under the concrete pad will result in stress cracks in the cement as the ground flexes.
Takedown request   |   View complete answer on concreteideas.com


How long does it take for 4 inches of concrete to cure?

The general rule of thumb is that concrete takes about 28 days to dry for every inch of slab thickness. Within 24 to 48 hours, the concrete will be ready for foot traffic.
Takedown request   |   View complete answer on wagnermeters.com


How long does dirt have to settle before pouring concrete?

An hour at most would be sufficient to let dirt and dust settle before you start pouring. If you have used a combination of water and rollers (or stompers) to compress the dirt, it is usually a good idea to wait for at least 4-6 hours.