How many times do you float concrete?

Push the bull float in one direction only across the concrete, keeping its front edge slightly above the surface by raising or lowering the handle. Two or three times is enough. Don't overwork the concrete or you'll weaken it by drawing too much sand and cement to the surface.
Takedown request   |   View complete answer on wonkeedonkeetools.co.uk


Can you float concrete too much?

Making too many passes with a float can overwhelm the surface with water, weakening the slab and increasing the likelihood of cracking.
Takedown request   |   View complete answer on sakrete.com


How many times do you trowel concrete?

For a really smooth finish, repeat the troweling step two or three times, letting the concrete harden a bit between each pass. At first, hold the trowel almost flat, elevating the leading edge just enough to avoid gouging the surface. On each successive pass, lift the leading edge of the trowel a little more.
Takedown request   |   View complete answer on familyhandyman.com


How long do you let concrete set before you float it?

Allow all of the water to disappear before you do anything else. This can take 20 minutes or 4 hours depending on the temperature, humidity and how hard the wind is blowing. After the bleed water is all gone you can get out your steel finishing trowel and put on the final touches.
Takedown request   |   View complete answer on instructables.com


How soon should I water concrete after pouring?

Properly curing your concrete improves strength, durability, water tightness, and resistance for many years. The first 7 days after installation you should spray the slab with water 5-10 times per day, or as often as possible. Once the concrete is poured the curing process begins immediately.
Takedown request   |   View complete answer on lifetimeenclosures.com


When To Start Finishing Concrete After The Pour



How long does 4 inches of concrete take to cure?

While it only takes around 28 days to cure concrete, drying can take months. The general rule of thumb is that concrete takes about 30 days to dry for every one inch of slab thickness.
Takedown request   |   View complete answer on wagnermeters.com


What happens if you dont water concrete?

Concrete that is not moist-cured at all dries too rapidly, and reaches less than half its potential design strength. It will also have a greater number of shrinkage cracks.
Takedown request   |   View complete answer on latimes.com


How long do you let concrete set before removing forms?

Walls and columns can be removed after about 24-48 hours
  1. Walls and columns can be removed after about 24-48 hours.
  2. Slabs, with their props left under them, can typically be removed after 3-4 days.
  3. Soffits, with their props left under them, can be removed after one week.
Takedown request   |   View complete answer on eiffeltrading.com


How do you make concrete smooth and shiny?

If the concrete floor is sloped, self leveling cement can be applied to make the surface even. Ardex or other similar self leveling cementitous mixes can be applied and poured on to the surface and then ground afterwords just like regular concrete to get a smooth shine.
Takedown request   |   View complete answer on paradigmconcretefl.com


How do you smooth concrete after pouring?

These are the 4 steps in how to smooth concrete after it dries:
  1. Remove all imperfections on the surface.
  2. Vacuum up all debris and apply the adherent.
  3. Apply a new layer of concrete.
  4. Sand the surface and wash the concrete.
  5. Apply a layer of vitrifier to protect the concrete.
Takedown request   |   View complete answer on bestfloorcoatingsaz.com


Can you pour concrete in two stages?

Sure you can pour the slab in two rounds. But if it's beyond y0ur skillset, I'm not sure it makes much difference whether you pour a big or small slab. Both are way too big for one guy. You'll need a crew - and if you don't have much experience finishing slabs, you need to hire someone who does.
Takedown request   |   View complete answer on greenbuildingadvisor.com


Can you smooth concrete after it dries?

Can You Smooth Concrete After It Dries? It is possible to smooth concrete after it dries, but in many cases, it requires a fresh layer of concrete over the top of the dried surface. This can allow you to keep the surface smooth and even, even though the concrete is completely dry.
Takedown request   |   View complete answer on plasticinehouse.com


Can you leave concrete forms on too long?

In short, there is no such thing as leaving concrete forms on for too long, as they will simply continue the curing process as the forms remain in place. However, there is no real need to leave forms on for longer than necessary.
Takedown request   |   View complete answer on homeimprovementscout.com


Can you over work concrete?

Concrete that is overworked can become dry and cracked. Concrete that is overworked before the bleed water has risen to the surface can trap that extra water within the mix, resulting in future problems with scaling.
Takedown request   |   View complete answer on texconreadymix.com


What might happen if heavy rain falls 10 hours after concrete is poured?

If the rainfall is heavy, it may wash off cement from portions of the concrete surface. It will weaken the structure and also reduce its durability. Unsealed concrete surfaces absorb water and crack due to freeze and thaw cycles. The most damaging effect of water is the scaling of concrete surfaces.
Takedown request   |   View complete answer on concretefaq.com


When should I brush my concrete?

When it comes to brooming, timing is critical—brush too early and the surface will be weak, brush too late and there won't be enough texture. It must be done while the slab is still soft, but after the bleed water has dissipated. Depending on the weather, this can take anywhere from 20 minutes to 4 hours.
Takedown request   |   View complete answer on concretenetwork.com


How do you make concrete glossy?

For this, you need to put a small amount of elbow grease on the area and sprinkle baking soda over it. Then use a damp cloth to rub around the area to make the area smooth and shiny again. Most of the time, you will be needing to follow this technique to make the concrete surface look shiny and smooth.
Takedown request   |   View complete answer on suggesthow.com


What is float finish concrete?

Float finishes

Prior to the introduction of power tools, a floated finish was that produced by a large, generally wooden or sometimes metal, hand float moved over the surface when the concrete was still plastic. This produced a flattish slightly textured surface which often contained float marks.
Takedown request   |   View complete answer on concrete.org.uk


How many times curing should be done in a day?

Slabs & Wall Curing

For walls proper water curing should be done, at least three times a day. For pillars it should be covered with Gunny or strand and it should be always in wet condition.
Takedown request   |   View complete answer on righthouse.in


How many days is the curing of concrete?

The answer is that your concrete will be ready in a surprisingly short time. Your concrete should be solid enough to walk on, without leaving footprints, after anything from 24 to 48 hours. By seven days, your concrete should be cured to at least 70 percent of its full strength.
Takedown request   |   View complete answer on dcpu1.com


Why would concrete not set?

If there is not sufficient water in the mix, the concrete will cure too fast, resulting in weaker overall strength. Too much moisture, often used in the finishing step will weaken the top layer and cause flaking. Hot ambient temperatures and wind accelerate the evaporation of moisture–speeding concrete setting time.
Takedown request   |   View complete answer on powerblanket.com